University of Arkansas Student Success Center
Owner
University of Arkansas
CONSTRUCTION MANAGER
VCC
MARKET
Education/Universities
LOCATION
Fayetteville, AR
Summary
Bass’ scope of work for the Student Success Center included drilled piers, footings, walls, columns, SOG, structural slabs, and SOD. We started work on the drilled piers in January 2020, fighting weather until the pier caps and basement slab was complete. The foundation wall encapsulates two sides of the building spanning to the 1st floor. Columns and shear walls span from the basement to the 5th level roof. All elevated slabs on this project consisted of post tensioned structural slabs that were shored until the above slab met structural strength.
Tons of Reinforcing
Cubic Yards of Concrete
Browse Similar Projects
 
							
						 
							
						 
							
						 
							
						 
							
						 
							
						 
							
						 
							
						 
							
						 
							
						Locations
6 Remington Cove
Little Rock, AR 72204
3301 N 2nd Street
Rogers, AR 72756
7730a Trinity Rd.
Cordova, TN 38018
© Copyright 2024 Bass Commercial Concrete, LLC
 
					 
					
				 
					
				